How a deck is built, from footings to railing

Frost line ≈ 1.2 m (4 ft)New: Footings

Shown: Multi-level deck — Step 1 of 5 — Footings

Everything below the boards — footings, posts, beams and joists — is what keeps a deck safe and level for decades.
  1. Footings or helical piles reach below the frost line so the deck can't heave in winter.
  2. Posts carry the load up from the footings.
  3. Beams and joists frame the structure under the boards.
  4. Decking boards and a picture-frame border finish the walking surface.
  5. A black metal safety railing (guard) goes up last, where required.
Est. 2020Footings below frostPermit drawings handledDeck + landscape design
Quick answer

Raised and multi-level decks turn walkouts, second-storey doors and sloped escarpment or ravine lots into connected outdoor rooms. Material pricing follows the typical Ontario installed ranges (2026), while multi-level layouts add roughly 25–40% versus a comparable single level. Your exact price comes from an on-site quote.

Fit before finish

Is this deck right for you?

Best for

  • Walkout and second-storey homes
  • Sloped escarpment or ravine properties
  • Separate dining, lounging and hot-tub zones
  • Yards needing useful space below the deck

May not suit

  • A simple level yard where one platform works better
  • Projects without room for longer stair runs
  • Budgets that do not account for guards, bracing and height

Profiles & details

Styles and options

Zoned levels

Dining, lounge and hot-tub areas step with the grade instead of competing on one platform.

Walkout decks

An upper deck preserves the main-floor connection while stairs lead to the yard below.

Under-deck rooms

Storage, screened skirting or a drainage ceiling can make tall space useful when planned early.

Landscape landings

Interlock landings and retaining walls resolve long stair runs at the bottom.

Multi-Level & Raised deck materials and construction details

Balanced guidance

Honest pros & considerations

Advantages

  • Makes difficult slopes useful
  • Creates distinct outdoor rooms
  • Preserves views from elevated doors
  • Can shelter practical space below

Considerations

  • Multi-level design adds roughly 25–40% versus a comparable single level
  • A full stair run typically adds $1,500–$3,000
  • Tall posts and beams need bracing and closer structural attention
  • Guards are 900 mm up to 1.8 m and 1,070 mm above 1.8 m
Typical Ontario installed range (2026)Material table below; multi-level +25–40%
Approximate lifespanVaries by selected surface
MaintenanceDepends on surface and exposure
Feel & heatElevated views with defined activity zones

Material decision

Compare the closest alternatives

Composite

Lifespan 25–30+ yrs
Maintenance Occasional washing
Cost band $$$ · $65–$95/sq ft

Look: Uniform boards, wood-look colours

Heat & comfort: Darker colours get warmer in full sun

Pressure-Treated Wood

Lifespan 15–20 yrs
Maintenance Regular staining/sealing
Cost band $$ · $45–$65/sq ft

Look: Classic wood, stains to suit

Heat & comfort: Stays comfortable underfoot; needs regular sealing

Lifespans are approximate, with proper installation and maintenance. Prices are typical Ontario installed ranges (2026); your exact price comes from an on-site quote.

Deck materials — typical Ontario installed ranges (2026)
MaterialLookLifespan (approx.)MaintenanceTypical range
Pressure-Treated WoodClassic wood, stains to suit15–20 yrsRegular staining/sealing$45–$65 / sq ft
CedarWarm natural grain15–25 yrsRegular staining/sealing$55–$80 / sq ft
CompositeUniform boards, wood-look colours25–30+ yrsLow — occasional washing$65–$95 / sq ft
PVCCrisp, premium finish30+ yrsLow — occasional washing$80–$110 / sq ft

Planning range

Estimate your deck

Estimated range for ~192 sq ft$17,180 – $27,240
  • Deck surface: $12,480–$18,240
  • Stairs: $1,500–$3,000
  • Railing: $3,200–$6,000

Raised decks need guards above 600 mm, taller posts and bracing, which push the per-sq-ft rate up. Confirmed on site.

Per-sq-ft rates usually drop as decks get larger; height, stairs, railings and complex shapes push them up.

Typical Ontario installed ranges (2026), not a quote. Your exact price comes from a free on-site visit.

Below the surface

How we build multi-level & raised decks

Height changes every connection. We establish loads, stair landings and guard lines first, then coordinate footings, bracing and the landscape below as one system.

  1. 01

    Survey the slope, doors, setbacks and permit path

  2. 02

    Set zones and stair landings against finished grades

  3. 03

    Size below-frost supports, tall posts, beams and bracing

  4. 04

    Frame each level with flashed attached or freestanding support

  5. 05

    Install selected boards, guards and safe stair transitions

  6. 06

    Finish interlock landings, drainage and under-deck options

What's inside a deck, from the ground up

Everything below the boards — footings, posts, beams and joists — is what keeps a deck safe and level for decades; click a layer to see why it matters.

2. Frost line (~1.2 m)

Footings must bear below frost depth — about 1.2 m / 4 ft in this region — so freeze–thaw can't heave the deck.

Ownership timeline

Care & maintenance

01Each spring

Inspect movement

Check tall posts, braces, stairs, guards and drainage after freeze–thaw.

02Seasonally

Keep water moving

Clear under-deck drains, stair landings and debris at posts.

03As required

Maintain the surface

Follow the selected wood, composite or PVC care guidance.

Hamilton · Burlington · Oakville

Permits and guard requirements

Hamilton

Any attached deck needs a permit. New or replacement guards also require a permit. Building Division: 905-546-2720.

Burlington

Attached decks and decks more than 600 mm above grade or over 10 m² commonly need a permit. Confirm with City of Burlington Building.

Oakville

Any attached deck needs a permit; detached decks over 10 m² and higher than 61 cm above grade also need one.

Confirm current requirements with your municipality before building.

Review the complete deck permit guide →

How high your deck railing (guard) must be

The higher a deck sits above the ground, the taller and stronger its safety railing must be.
  • Railing (guard)
  • Height rule — see key
  1. Up to 600 mm (2 ft) above the ground: Railing not required by height alone.
  2. 600 mm – 1.8 m (2–6 ft) above the ground: Railing at least 900 mm (3 ft) tall.
  3. More than 1.8 m (6 ft) above the ground: Railing at least 1,070 mm (3.5 ft) tall.
  4. Any gap in the railing must be too small for a 100 mm (about 4 in) ball to pass through.

Type-specific answers

Multi-Level & Raised FAQ

Do raised decks need engineering?

Some do, depending on height, spans, loads, soil and municipal review. Tall posts, bracing and unusual conditions deserve closer structural attention.

How much more does a multi-level deck cost?

The research brief allows roughly 25–40% over a comparable single-level deck. Material, stairs, guards, height and access determine the actual quote.

What railing height do I need?

Ontario guards are 900 mm where the deck is up to 1.8 m above grade and 1,070 mm above 1.8 m, with a 100 mm opening limit.

Can the space under a deck be used?

Yes. Options include open planting, storage, screened skirting or an under-deck drainage ceiling, provided access and ventilation are planned.

What affects second-storey deck cost?

Taller supports, bracing, guards, longer stairs, equipment access and the structure at the house all affect scope.

Can you build on a slope?

Yes. The slope must be surveyed and footings, stair landings, drainage and any retaining walls coordinated before construction.

Local deck building

Hamilton, Ancaster, Burlington & Oakville

Hamilton

Hamilton MountainAncasterDundasStoney CreekWaterdownBinbrookFlamboroughWestdaleKirkendallGlanbrook

Burlington

AldershotBrant HillsTyandagaMillcroftApplebyLaSalle

Oakville

BronteGlen AbbeyRiver OaksPalermoOld OakvilleKerr Village

Start on site

Plan your multi-level & raised deck.

Share the approximate size, height, stairs, railings and city. We’ll arrange a free on-site design consult and exact quote.

Your exact price comes from an on-site quote.