Hamilton site plan approval
Grading and landscape plans for site plan approval usually need a stamp from an architect, engineer or landscape architect. Minor projects can be exempt.
Planting & finishing
Design & Build
One plan for the whole yard, from the first layout to the finished build.
Go to Design & BuildPool Installation
Fibreglass, vinyl liner and concrete pools, with the patio, fence and landscaping around them.
Pool Installation overviewFire Features
Gas fire pits, wood fire pits and outdoor fireplaces, planned around your city's burn rules.
Fire Features overviewWater Features
Ponds, pondless waterfalls and fountains, with the depth, power and winter care planned first.
Water Features overviewRetaining Walls
Armour stone, interlocking block and natural stone walls, built to hold the grade.
Retaining Walls overviewPrepare the site

We install planting, sod, beds and trees to the approved plan. Species, sizes and locations follow the drawings for inspection and Money held by the City until approved work is finished. release.
Prequalification documents available on requestWe plant exactly what the approved plan shows, flag substitutions before ordering, and clear deficiencies for sign-off. Common reasons money stays held:
For owners and developers closing out a Hamilton site plan. Shows the steps to confirm in your agreement.
This is a sequence, not a date calculator. The City holds landscape securities until it's satisfied the approved landscape works are built and the planting has established. Release timing and conditions, such as inspections, sign-off and any partial reductions, are set by your site plan agreement. Confirm them with the City.
Next: review your agreement with the City and consultant.
Grading and landscape plans for site plan approval usually need a stamp from an architect, engineer or landscape architect. Minor projects can be exempt.
The City holds landscape securities until it's satisfied the approved landscape works are built and the planting has established.
The City holds landscape securities until it's satisfied the approved landscape works are built and the planting has established. Release timing and conditions, such as inspections, sign-off and any partial reductions, are set by your site plan agreement. Confirm them with the City.
Short summaries for planning. Check them against the current rules, your municipality’s conditions and your design professional.

Yes. We plant the species, sizes, quantities and locations on the approved plan. If a plant is hard to get, we flag it early so a substitute is approved before planting.
The City holds landscape securities until it's satisfied the approved landscape works are built and the planting has established. Release timing and conditions, such as inspections, sign-off and any partial reductions, are set by your site plan agreement. Confirm them with the City.
Yes, if it is in the contract. Replacement of failed plant material can be included in the scope so the site is ready for the release inspection.
No. Our commercial division focuses on construction and installation.
Send the drawings and site details. We’ll confirm scope before pricing.