Book Your Free Hardscape Design Consultation Today! · Call (647) 459-7775
Generated concept of a warm-toned composite deck with black aluminum railing and wide stairs to an interlock patio at golden hour

Decks · Hamilton · Halton

Deck Building in Hamilton, Burlington & Oakville

Decks designed as part of the whole yard — with the patio, steps, retaining walls, planting and lighting planned together, and footings set below frost.

Frost line ≈ 1.2 m
Est. 2020Footings below frostPermit drawings handledDeck + landscape design under one roof
Quick answer

Antoine Landscape Contractors designs and builds pressure-treated, cedar, composite and PVC decks across Hamilton, Ancaster, Burlington and Oakville. Typical Ontario installed ranges (2026) run about $45–$110 per sq ft depending on material, and every deck we build sits on footings below frost depth. Start with a free on-site design consult for an exact quote.

One yard, one plan

Why a landscape company for your deck?

Most deck builders stop at the last stair. We design where that stair lands: the interlock patio below, the steps and retaining walls that handle the grade, the planting that softens the skirting and the lighting that makes it usable after dark. One design, one crew, one schedule — so the deck and the yard feel like they were always meant to be together.

Visual language

Design your deck’s look

Try board colours, borders, layouts and railings. The render is illustrative — we bring real samples to your design consult.

Illustrative render — not a specific product.

Walnut brown, picture-frame border, straight layout, black aluminum picket railing. Rich and warm; a popular 2026 natural tone. Straight boards are the cleanest and most efficient layout. Black aluminum picket is the most requested railing.

Board colour
Border
Board direction
Railing

Side-by-side

Compare deck materials

Pressure-Treated Wood

Lifespan 15–20 yrs
Maintenance Regular staining/sealing
Cost band $$ · $45–$65/sq ft

Look: Classic wood, stains to suit

Heat & comfort: Stays comfortable underfoot; needs regular sealing

Composite

Lifespan 25–30+ yrs
Maintenance Occasional washing
Cost band $$$ · $65–$95/sq ft

Look: Uniform boards, wood-look colours

Heat & comfort: Darker colours get warmer in full sun

Lifespans are approximate, with proper installation and maintenance. Prices are typical Ontario installed ranges (2026); your exact price comes from an on-site quote.

Deck materials — typical Ontario installed ranges (2026)
MaterialLookLifespan (approx.)MaintenanceTypical range
Pressure-Treated WoodClassic wood, stains to suit15–20 yrsRegular staining/sealing$45–$65 / sq ft
CedarWarm natural grain15–25 yrsRegular staining/sealing$55–$80 / sq ft
CompositeUniform boards, wood-look colours25–30+ yrsLow — occasional washing$65–$95 / sq ft
PVCCrisp, premium finish30+ yrsLow — occasional washing$80–$110 / sq ft

Transparent planning

Estimate a market range

A planning range based on typical ontario installed ranges (2026) for decking, stairs, railings and multi-level layouts. Your exact price comes from an on-site quote.

Estimated range for ~192 sq ft$17,180 – $27,240
  • Deck surface: $12,480–$18,240
  • Stairs: $1,500–$3,000
  • Railing: $3,200–$6,000

Raised decks need guards above 600 mm, taller posts and bracing, which push the per-sq-ft rate up. Confirmed on site.

Per-sq-ft rates usually drop as decks get larger; height, stairs, railings and complex shapes push them up.

Typical Ontario installed ranges (2026), not a quote. Your exact price comes from a free on-site visit.

Browse our planning guides →

Below the surface

How we build decks that last

  1. 01

    Design consult & measure

    A free on-site visit to understand how you'll use the space, measure and discuss materials.

  2. 02

    Survey, setbacks & lot coverage

    We check the survey, zoning setbacks and lot coverage before design is final.

  3. 03

    Permit drawings & application

    Where a permit is required, we prepare drawings and handle the application.

  4. 04

    Ontario One Call locates

    Free utility locates are requested before any digging.

  5. 05

    Footings below frost

    Concrete piers or helical piles bear below frost depth — about 1.2 m / 4 ft here.

  6. 06

    Framing, ledger & joist tape

    Pressure-treated framing, a flashed and fastened ledger or freestanding beam, and joist protection tape on composite/PVC builds.

  7. 07

    Decking, borders & stairs

    Hidden fasteners and correct gapping, picture-frame borders and code-compliant stairs.

  8. 08

    Railings, lighting & skirting

    Guards, pre-planned lighting sleeves and skirting finish the structure.

  9. 09

    Inspection, cleanup & walkthrough

    Inspections where required, full cleanup and a final walkthrough together.

Frost ≈ 1.2 m900 / 1,070 mm
Frost line (~1.2 m)

Footings must bear below frost depth — about 1.2 m / 4 ft in this region — so freeze–thaw can't heave the deck.

Permits, made clear

Do you need a deck permit?

Step 1 of 7: Where is the property?
600 mm guard trigger900 mm min.100 mm sphere1,070 mm min.
  • Up to 600 mm above grade: Guard not required by height alone.
  • 600 mm – 1.8 m above grade: Guard at least 900 mm.
  • More than 1.8 m above grade: Guard at least 1,070 mm.

Guard openings must not allow a 100 mm sphere to pass. Source: Ontario Building Code. Confirm current requirements with your municipality before building.

Hamilton

Permit needed for any attached deck; detached decks over 10 m² and more than 200 mm above grade; detached covered decks over 10 m²; small decks by a door more than 600 mm up; and new or replacement guards. Source: City of Hamilton. Building Division 905-546-2720. Ancaster, Dundas, Stoney Creek, Waterdown and Flamborough follow Hamilton.

Burlington

Follows Ontario Building Code permit triggers. A permit is commonly needed for attached decks and for decks more than 600 mm above grade or over 10 m². Confirm with City of Burlington Building before building.

Oakville

Permit needed for any deck attached to a house, and for decks over 10 m² and higher than 61 cm above grade. All decks must meet the zoning by-law. Source: Town of Oakville. Call Ontario One Call (1-800-400-2255) before digging.

Confirm current requirements with your municipality before building. Permit-exempt never means code-exempt — zoning setbacks and lot coverage still apply. Where a permit is needed, we prepare the drawings and handle the application.

Straight answers

Deck building FAQ

Do I need a permit to build a deck?

Often, yes. In Hamilton any deck attached to a building needs a permit, as do larger or higher detached decks and new or replacement guards. In Oakville any attached deck, or a deck over 10 m² and higher than 61 cm, needs one. Burlington follows Ontario Building Code triggers. Confirm current requirements with your municipality before building.

How much does a deck cost per square foot?

Typical Ontario installed ranges (2026) are about $45–$65 per sq ft for pressure-treated, $55–$80 for cedar, $65–$95 for composite and $80–$110 for PVC. Stairs, railings, height and multi-level layouts add cost. Your exact price comes from an on-site quote.

Is composite better than wood?

Composite typically lasts 25–30+ years with very little upkeep, while pressure-treated (15–20 years) and cedar (15–25 years) cost less up front but need regular staining or sealing. Wood feels more natural; composite stays more uniform.

What is the best deck material for Ontario winters?

Composite and PVC handle freeze–thaw, snow and moisture with the least maintenance. Well-maintained wood performs well too. In every case, footings below frost depth matter more than the board you choose.

How deep do deck footings go?

Footings must bear below frost depth — about 1.2 m (4 ft) in this region — so freeze–thaw doesn't heave the deck.

Helical piles or concrete piers?

Both can bear below frost. Helical piles are screwed in with little excavation and can be loaded right away; concrete piers are a proven standard. We recommend based on soil, access and design.

How high do deck railings need to be?

Under the Ontario Building Code, guards are required where the deck is more than 600 mm above grade. They must be at least 900 mm high where the deck is not more than 1.8 m above grade, otherwise at least 1,070 mm, with openings that won't pass a 100 mm sphere.

How long does a deck build take?

Typically 1–2 weeks of construction for most decks. Larger or multi-level decks take longer, and permits add time before work starts.

Can you build a deck on a slope?

Yes. Sloped yards often suit raised or multi-level decks, sometimes paired with retaining walls, steps and grading so the whole yard works.

Should I choose a deck or an interlock patio?

Decks suit raised doors, slopes and a warm board feel; interlock patios suit ground-level spaces and heavy use. Many yards use both — a deck off the house stepping down to a patio.

Local deck building

Hamilton, Ancaster, Burlington & Oakville

We build decks across Hamilton’s communities — including Ancaster, Dundas, Stoney Creek, Waterdown and Flamborough — plus Burlington and Oakville.

Hamilton

Hamilton MountainAncasterDundasStoney CreekWaterdownBinbrookFlamboroughWestdaleKirkendallGlanbrook

Burlington

AldershotBrant HillsTyandagaMillcroftApplebyLaSalle

Oakville

BronteGlen AbbeyRiver OaksPalermoOld OakvilleKerr Village
Generated composite deck design concept at golden hour

Start with the yard

Plan a deck that belongs in the landscape.

Tell us the approximate size, material, height and city. We’ll arrange a free on-site design consult and an exact quote.

Your exact price comes from an on-site quote.