Book Your Free Hardscape Design Consultation Today! · Call (647) 459-7775
New asphalt path winding through a municipal park past planted trees and sod

Parks & public spaces

We build paths, play-area surrounds, walls, fences, grading, topsoil, sod and trees for municipal parks. We build to the tender drawings, the province’s standard specs () and Ontario’s accessibility rules.

Prequalification documents available on request

At a glance

  • What we build: Paths, play-area site prep, walls, fences, topsoil, sod and trees.
  • Who it’s for: City parks departments, landscape architects and general contractors.
  • How to hire us: Send a tender number, invite us to quote smaller works, or send the GC package.
  • Key standard: Tender drawings and OPS specs, as each city amends them.

What this site needs

Built to the tender, not to our habits

City drawings, OPS specifications as amended and standard drawings govern.

Accessible from day one

Paths and site work follow the accessible details in the design.

Trees set up to establish

Soil volumes and tree protection belong in the scope.

Parts of a park

Park plan explorer

For owners and designers planning the site. Tap a numbered point to see the note. Takes 1 minute.

Path: Path grading and base to the park design. Hamilton’s Parkside Hills Park plan, for example, specifies 3 m wide asphalt walkways. Width, slope and surface follow the accessibility details.

Park plan, overhead view

Illustration only — tap a number to read its note; your site drawings set the exact layout.
  1. Path: Path grading and base to the park design. Hamilton’s Parkside Hills Park plan, for example, specifies 3 m wide asphalt walkways. Width, slope and surface follow the accessibility details.
  2. Play area surround: Paver edge restraint and site prep to the designer’s details; cast-in-place curbs by others. CSA Z614 governs public playground equipment and surfacing; the play supplier handles those items.
  3. Trees: Hamilton's forestry manual sets soil volumes and Tree Protection Zones (the fenced area kept clear around a tree). New public plantings carry a two-year warranty period under City rules.
  4. Topsoil: OPSS 802 — Topsoil.
  5. Existing trees: OPSS 801 — Protection of Trees, as amended by the City.
  6. Seating & rest: Rest areas along paths are part of accessibility consultation for new paths.

Path

Path grading and base to the park design. Hamilton’s Parkside Hills Park plan, for example, specifies 3 m wide asphalt walkways. Width, slope and surface follow the accessibility details.

How we calculated this

Each marker matches a note from the sector brief. This is a plan guide, not a measurement.

Next: compare the notes with your site drawings.

Standards that shape the work

Accessibility

New or redeveloped outdoor paths for covered owners need set widths, slopes, surfaces, gaps and headroom.

Show the full rule

These rules cover new or redeveloped outdoor paths. They apply to public-sector organizations, and to businesses and non-profits with 50 or more employees. Covered paths need at least 1,500 mm of clear width (1,200 mm at a curb-ramp turning space).

  • A running slope (along the path) no steeper than 1:20, or it must be designed as a ramp.
  • A cross slope (side to side) no more than 1:20 on asphalt and concrete (we treat concrete pavers and slabs the same way) — 1:10 on other surfaces such as compacted aggregate.
  • A firm, stable, slip-resistant surface.
  • Openings no larger than 20 mm.
  • At least 2,100 mm of headroom.
Design of Public Spaces Standards, O. Reg. 191/11 ↗
Read the AODA Exterior Paths of Travel: Checklist guide →

Play areas / CSA Z614

Z614 governs children’s playground equipment and surfacing. Equipment and protective surfacing are supplied by the play supplier.

OPS specifications

City tenders use the province's standard specs (), as each city amends them. Two common ones are OPSS 801 (protecting trees) and OPSS 802 (topsoil). In Burlington, the city's own standard drawings come first.

Hamilton forestry

The forestry manual sets soil volumes, tree protection zones and a two-year warranty period for newly installed public assets.

Short summaries for planning. Check them against the current rules, your municipality’s conditions and your design professional.

How we work on your site

  • Fence work zones and post signage
  • Keep park routes open where possible
  • Protect existing trees before work
  • Clean up daily
  • Arrange before digging
  • Protect existing park assets
  • Walk deficiencies with the City representative

How to hire us

Invite us to quote smaller works directly. General contractors can send the landscape package for sub-pricing.

How we work with you

  1. 1

    Send drawings

  2. 2

    Site walk

  3. 3

    Priced scope with exclusions

  4. 4

    Schedule and mobilize

  5. 5

    Walkthrough and close-out

Concrete curb surround being formed around an empty park play area

Common questions

Can you price municipal park work?

Yes. Send us the tender number or invite us to quote smaller works. On larger tenders we can price the landscape and site package for the general contractor.

Do you install playground equipment?

No. We build site work around it — grading, paver edges, paths and drainage — to the designer’s details. Equipment and surfacing are by the play supplier.

Which specifications do you build to?

We build to the tender documents. That means the city's specs and standard drawings, plus OPS specs as each city amends them.

Do park walkways have to meet accessibility requirements?

Yes, if the path is new or redeveloped and the owner is covered by Ontario's Design of Public Spaces Standards. Covered paths must meet the width, slope and headroom rules.

Request a bid

Send drawings, site details and a tender reference if you have one.

What happens next

  1. We review your drawings and scope.
  2. We call or email to confirm details and questions.
  3. You get a priced scope.
Add project details (optional)
Which trades?
Pricing comes from drawings and a site review. Prefer to talk? (647) 459-7775.