Book Your Free Hardscape Design Consultation Today! · Call (647) 459-7775
Inground pool with a light interlock deck, black aluminum pool fence and mature trees in a Southern Ontario backyard at golden hour

Pool installation · Hamilton, Burlington & Oakville

Inground Pool Installation in Hamilton, Burlington & Oakville

Antoine installs fibreglass, vinyl liner and concrete pools and builds the landscape around them, as one project with one point of contact.

Backyard layout at a glance

EquipmentGate
A pool fence with a self-closing gate must fully enclose the pool and deck, with equipment set off to the side.
Est. 2020Fibreglass, vinyl & concretePool + landscape as one projectHamilton-based

Quick answer

Typical installed-pool market ranges in Ontario are $55k–$110k for vinyl liner, $65k–$120k for fibreglass and $100k–$250k for concrete (HomeStars Ontario, Aug 2026). Fencing, decking and landscaping commonly add 40–60% to the pool price (Devine Image, Apr 2026). A typical project runs 8–12 weeks, and fall is the time to book for a spring build.

  • ServiceFibreglass, vinyl liner and concrete inground pools, plus the landscape around them
  • AreasHamilton (incl. Ancaster, Dundas, Stoney Creek, Waterdown/Flamborough), Burlington and Oakville
  • CompanyEst. 2020 · 200+ projects
  • QuotesFree on-site quotes
  • Phone(647) 459-7775

Three ways to build

Choose your pool

Rectangular fibreglass pool with a tan interlock deck in a Southern Ontario backyard
01

Fibreglass

A factory-made shell set into a prepared hole, with the shortest site schedule of the three.

Typical market range
$65k–$120k (HomeStars Ontario inground pool cost guide, Aug 2026)
Typical build time
About 1 week of site work; 3–6 weeks to a finished project with coping, patio and fence (MoneySense, Jun 2024; River Pools)
Surface upkeep
Gelcoat refinish every 20–30 years, up to $15,000 (MoneySense, Jun 2024)
Explore fibreglass pools → Compare below ↓
Vinyl liner pool with a blue patterned liner and grey paver deck beside a cedar hedge
02

Vinyl liner

Wall panels and a custom liner that fit almost any shape, with the lowest entry price of the three.

Typical market range
$55k–$110k (HomeStars Ontario inground pool cost guide, Aug 2026)
Typical build time
A few weeks (MoneySense, Jun 2024)
Surface upkeep
Liner replacement every 7–10 years, $4,500–$6,500 (HomeStars Ontario inground pool cost guide, Aug 2026)
Explore vinyl liner pools → Compare below ↓
Freeform concrete pool with waterline tile and natural stone coping under mature maples
03

Concrete (gunite / shotcrete)

Sprayed concrete over a steel cage, built on site to any shape, depth or finish.

Typical market range
$100k–$250k (HomeStars Ontario inground pool cost guide, Aug 2026)
Typical build time
2–3 months before permits and inspections (Orange Pools, Jul 2026)
Surface upkeep
Acid wash every 3–5 years (about $2,000); replaster every 10–12 years, $12,000–$15,000 (MoneySense, Jun 2024)
Explore concrete pools → Compare below ↓

Typical market ranges from the named source and date. Your exact price comes from an on-site quote.

Industry practice

Inside each pool

Inside a pool's wall and floor

How to read this: A side view of the pool wall and floor, cut in half. Tap a layer to read what it is; the numbered list says the same thing.

  1. Native soil. Over-dug and levelled to the shell's footprint.
  2. Compacted gravel base. About 2 in of compacted gravel under the shell.
  3. Shell. Gelcoat, vinyl-ester barrier coat, chopped-glass and polyester laminate with woven roving at stress points, then ribs.
  4. Gravel backfill. Placed as the shell takes on water so pressure stays balanced; the site stays behind temporary fencing until the permanent enclosure passes inspection.
  5. Bond beam. About 8 in of rebar-reinforced concrete around the perimeter.
  6. Coping. Paver, stone or poured edge over the bond beam.
  7. Deck. Pavers or concrete sloped away from the water.

Based on industry practice; not Ontario code. Not to scale.

Each pool type is built up from different layers, shown here from the bottom up.

Line by line

The real all-in budget

Pick a pool type, deck size and equipment to see how a pool-only price grows into the full project. Your exact price comes from an on-site quote.

How to read this: Pick your pool and extras. Each line shows a typical market range from a named source; the total adds up the low ends and the high ends. Not our prices.

Pool type
Price source
Interlock pool deck (sq ft)
$25–$45 per sq ft (Allen Landscaping, Mar 2026)
Heater
Cover
Add-ons and site risks

Typical all-in market range

$89,500–$170,000

  • Pool: $65,000–$120,000
  • Surrounds: $19,000–$39,000
  • Equipment: $5,500–$11,000
Pool alone$65,000–$120,000
All-in$89,500–$170,000
Pool budget line items
Line itemTypical market rangeSource
Fibreglass pool, installed$65,000–$120,000HomeStars Ontario inground pool cost guide, Aug 2026
Interlock pool deck (600 sq ft) ($25–$45 per sq ft)$15,000–$27,000Allen Landscaping, Mar 2026
Pool fence$4,000–$12,000Devine Image, Apr 2026
Heat pump$2,000–$6,000HomeStars Ontario inground pool cost guide, Aug 2026
Standard safety cover$3,500–$5,000Boulder Design, Feb 2026
All-in total$89,500–$170,000

Typical market ranges from the named source and date. Your exact price comes from an on-site quote. Spoil haul-away, where needed, runs 200–400 cubic yards at $40–$80 per yard (Orange Pools, Jul 2026).

Cost of ownership

What 25 years of ownership looks like

How to read this: Each line shows the running total a pool type could cost to own, year by year. Lower is cheaper. Change the years or the liner interval to update it.

Horizon

Up: total cost to own, CAD (k = thousand dollars). Across: years owned.

Illustrative cumulative ownership cost over 25 years for fibreglass, vinyl liner and concrete pools0k100k200k300kYr 0Yr 13Yr 25

Illustrative estimate, not a quote.

  • Fibreglass: $152,500 over 25 years
  • Vinyl liner: $143,500 over 25 years
  • Concrete: $276,500 over 25 years
10 and 25 year illustrative totals
Pool type10-year total25-year total
Fibreglass$110,500$152,500
Vinyl liner$108,000$143,500
Concrete$204,000$276,500

Illustrative estimate, not a quote. Assumptions:

  • Upfront cost: midpoint of the HomeStars Ontario range (Aug 2026): vinyl liner $82,500, fibreglass $92,500, concrete $175,000.
  • Yearly running cost: MoneySense (Jun 2024) seasonal upper figures: fibreglass $1,800, vinyl $2,000, concrete $2,500.
  • Vinyl liner replaced every 8.5 years (adjustable) at $5,500, the HomeStars range midpoint.
  • Fibreglass gelcoat refinished once at year 25 at $15,000 (MoneySense: every 20–30 years, up to $15,000).
  • Concrete acid wash every 4 years at $2,000 and replaster every 11 years at $13,500 (MoneySense midpoints).
  • No inflation, financing, repairs, heating upgrades or surrounds included.

Timing

When to start: Ontario's pool season

How to read this: The months of the year run left to right. Each colour band is a stage of a pool project; pick a pool type to see when it's typically ready to swim.

  1. JanDesign & permits
  2. FebDesign & permits
  3. MarDig when frost is out
  4. AprDig when frost is out
  5. MayBuild
  6. JunBuild
  7. JulSwim
  8. AugSwim
  9. SepBook
  10. OctClose in October; book
  11. NovBook
  12. DecDesign & permits
Typical swim-ready: Late May–June
  1. Book Sep–Nov
  2. Design & permits Dec–Feb
  3. Dig when frost is out Mar–Apr
  4. Build May–Jun
  5. Swim Jul–Aug
  6. Close in October Oct

Typical swim-ready: fibreglass and vinyl liner late May–June; concrete July or later.

  • A typical project runs 8–12 weeks from design to finish (Edgewater Pools; Oakville's Finest Pools).
  • Fall booking is "the best value" to secure an early-spring slot (Orange Pools, Jul 2026).
  • Pools open late April to mid-May (Earthworks, Sep 2026) and close in October (Sima Canada).
  • Permit review: Burlington 4–6 weeks; Oakville 5-day pre-screen then 6–8 weeks.

Typical, not a guarantee.

By-laws and permits

Your city's pool rules

How to read this: Left: a bird's-eye view of a backyard. The orange numbers are the minimum distances your city requires. Right: the pool fence from the side, with the minimum height and where the gate latch goes.

Where the pool must sit on the lot

Rear lot lineSide lot lineHouseSelf-closing gatePoolPool pump1.25 m1.25 m1 m0.6 m to lot lineSetback band (see key below)Pool fencePool deck
  • 1.25 m (4 ft) from the lot line to the water (the orange band)
  • Pool fence, 1 m (3.3 ft) out from the water
  • Pool deck
Orange shows the minimum distance from the lot line to the water; keep the fence and equipment pad outside it too.

Minimum pool fence height and gate latch

2 m (6.6 ft) maxlatch 1.35 m1.5 m (5 ft) minLatch on the inside, ≥1.35 m
The fence must be at least the height shown, with the gate latch at the marked height.
By-law
16-184, amended by 22-059 (consolidated Jan 2023)
Permit route
Enclosure Permit, Building Division (905-546-2720); owner signs the Oct 2025 checklist
2026 fees
Set by the User Fees By-law; not published in the City documents we reviewed. Confirm with the Building Division
Fence height
1.5 m (2.0 m max per checklist)
Gate
Self-closing; self-latching on the inside at ≥1.35 m; lock
Fence from water
≥1.0 m from the inside pool wall
Pool setback
1.25 m from any lot line to the water's edge; not in the required front yard (Zoning By-law 05-200 s. 4.11)

A 1.2 m wood fence that passes in Burlington fails in Hamilton, where the minimum is 1.5 m. Ancaster, Dundas, Stoney Creek and Waterdown/Flamborough follow Hamilton's pool enclosure by-law. Some lots still fall under former zoning by-laws (05-200 low-density zones apply to about 75% of properties); a local builder cites 1.5 m Ancaster and 1.0 m Dundas rear-yard setbacks, so zoning is confirmed lot by lot. All three: you may not fill the pool until the permanent enclosure passes inspection. Confirm current rules with your municipality before building.

All three cities side by side

RuleHamilton (incl. Ancaster, Dundas, Stoney Creek, Waterdown/Flamborough)BurlingtonOakville
Enclosure by-law16-184, amended by 22-059 (consolidated Jan 2023)74-20052006-071 (consolidated Mar 28, 2022)
What counts as a poolCan hold more than 0.6 m of water; hot tubs and ponds includedOver 600 mm deepOver 0.61 m (2 ft)
Permit routeEnclosure Permit, Building Division (905-546-2720); owner signs the Oct 2025 checklistOnline Combined Residential Swimming Pool Application (zoning + forestry + enclosure); 4–6 weeks; needs an Ontario Land Surveyor survey and arborist report or tree declaration; incomplete applications not acceptedDevelopment Engineering Permit, online; 5-day pre-screen, then 6–8 weeks
2026 feesSet by the User Fees By-law; not published in the City documents we reviewed. Confirm with the Building Division$205 zoning + $344 in-ground enclosure + $61.02 forestry; hot tub $87 (2026 fee schedule; the older printed checklist still shows $182/$334)$354 pools and hot tubs (one inspection); $651.62 simple pool with enclosure; $1,616.64 site-alteration pool (in-ground with landscaping); $367.25 per extra inspection; plus securities of 100% of the cost estimate, released after inspections. Confirm which line applies with the Town
Minimum fence height1.5 m (2.0 m max per checklist)1.2 m wood or 38 mm chain link; 1.5 m wrought iron; 1.8 m for 50 mm chain link; 2.0 m max1.20 m
OpeningsNo opening passes a 100 mm sphere; chain-link mesh ≤38 mm38 mm, or 100 mm if rails >1.2 m apart; ≤100 mm under the fence38 mm by default (exceptions up to 100 mm); ≤50 mm under the fence
GateSelf-closing; self-latching on the inside at ≥1.35 m; lockSelf-closing, self-latching at top and inside; thumb latches don't qualifySelf-closing within 30 seconds; latch ≥1.22 m; gate ≥1.52 m from the water
Fence distance from water≥1.0 m from the inside pool wall≥1.2 m from the inside edge≥0.91 m
House door as part of enclosureAllowed; keep closed/locked when unsupervised; fence between house and pool must be see-throughAllowed (wall ≥1.2 m); openings lockedBolt or chain latch ≥1.83 m above the inside floor
Not allowedHedges, overhead garage doors, barbed materials, anything that helps climbing; glass-panel fences need an Ontario P.Eng. designNot listedRemoving any part of the enclosure while the pool holds water
Temporary fenceDiamond mesh ≤38 mm; max 7 consecutive days unless the Director allows longerApproved by the Chief Building Official1.22 m snow fence through all phases
Hot tub alternativeLocked rigid cover rated 90 kg (or ASTM)Lockable lid; separate $87 permit (under 8 m²)No permit or fence with a locked cover rated 90.72 kg
Zoning setback, pool1.25 m from any lot line to the water's edge; not in the required front yard (Zoning By-law 05-200 s. 4.11)1.5 m from lot or street line, measured from the inside wall; lots under 12 m wide: rear yard only1.5 m rear and interior side; 3.5 m flankage (corner lot street side); not in the front yard; max 1.5 m above grade; measured to the water's edge (Zoning 2014-014 s. 4.16.1; RL amendments 2026-088 adopted Jun 15, 2026 may change details)
Equipment setbackPool pumps 0.6 m from side and rear lot lines (s. 4.9)60 cm from side and rear lot lines; not in the front yardPumps/filters/heaters as close as 0.6 m to side/rear lot lines; max 2.0 m high
DrainingDechlorinate to ≤0.1 mg/L (about 2 weeks without chemicals), drain slowly onto your own lawn; never to storm sewers, streets or ravines; salt water to an indoor drain on the sanitary line or a licensed hauler (Sewer Use By-law 14-090)Dechlorinate (about 1 week), drain across the lawn; salt water to the sanitary drain; never into ravines or onto neighboursDirect pool water to the street curb and gutter; never onto neighbouring lots (Property Standards By-law 2023-074 s. 22(4))
PenaltiesUp to $10,000 first conviction / $25,000 after (individuals)Up to $5,000AMPs $300/$400/$500; up to $5,000 on conviction

Oakville also takes securities of 100% of the cost estimate, released after inspections; grading inspections can't happen on snow-covered ground, so a late-fall finish can push release to spring. Lots in a floodplain, valley or shoreline area need a conservation authority permit (O. Reg. 41/24), and parts of Ancaster, Dundas, Flamborough and rural Burlington sit in the Niagara Escarpment Development Control Area, where an NEC permit is needed unless every exemption test is met. Confirm current rules with your municipality before building.

Ground conditions

What's under your yard

Ground conditions from the lake to the mountain

How to read this: A side view of the ground from Lake Ontario up to the Mountain. Tap a numbered marker or the matching list item to read what the ground is like there.

Lake Ontario, lower city sand and clay, escarpment, and the Mountain with rock under till. Numbered markers match the ground conditions below.Lake OntarioLower city(sand & clay)EscarpmentThe Mountain(rock under till)12345

Simplified schematic, not to scale; ground varies lot by lot.

Soil changes from sandy clay near the lake to rock and glacial till near the escarpment, which affects how a pool is dug and built.

Electrical safety

Bonding, deck and fence: the order matters

The pool's bonding zone (grounding safety ring)

How to read this: A bird's-eye view of a pool. Metal inside the dashed outer line, 1.5 m from the water, must be bonded. The numbers match the list under the drawing.

Pool bonding zone: 1 is the 1.5 m (5 ft) metal bonding zone, 2 the 1 m (3.3 ft) deck grid, 3 pool water, 4 fence post, 5 ladder, 6 rebar.
  1. 1.5 m (5 ft) zone: connect nearby metal to the bonding wire
  2. 1 m (3.3 ft) deck grid zone
  3. Pool water
  4. Metal fence post
  5. Ladder
  6. Rebar
  • Anything metal within 1.5 m (5 ft) of the water — fence posts, ladders, rebar, pipes — gets connected to the bonding wire.
  • Concrete or paver decks get a copper grid underneath; a wood or composite deck may not need one.
  • A licensed electrician does this and ESA inspects it before the deck goes down.
Read ESA Bulletin 68-8-4
Any metal within 1.5 m (5 ft) of the pool water must be electrically bonded (grounded) for safety.

Step by step

How a pool project runs

  1. On-site consultation & locates

    We walk the yard, check access, and request a free Ontario One Call locate before any digging.

  2. Design & layout

    Pool, deck, fence, grading and drainage planned together on one drawing.

  3. Permits & approvals

    Enclosure permit, zoning, trees, and conservation authority or NEC review where the lot needs it. We walk you through your city's pool enclosure permit.

  4. Excavation & spoil removal

    Digging once the ground thaws, with excavated material hauled to an approved site.

  5. Pool installation

    Shell set and backfilled, wall panels and liner fitted, or the concrete shell sprayed and finished, depending on the type.

  6. Electrical, gas & bonding inspection

    Electrical by a Licensed Electrical Contractor with an ESA notification and gas by a qualified gas technician, as Ontario law requires.

  7. Coping, deck, fence & landscape

    Coping, pool deck, enclosure fence and planting, sequenced around the bonding inspection.

  8. Inspection, fill & start-up

    The enclosure passes inspection before the pool is filled, then start-up and first-season care tips.

Layers of protection

Safety first

Layers of pool safety

How to read this: Each row is one separate layer of protection around a pool, read from top to bottom.

  1. Four-sided isolation fenceAt least 1.5 m (Lifesaving Society recommendation; your city's minimum may be lower), separating the pool from the house and yard.
  2. Self-closing, self-latching gateLatch at least 1.22 m high.
  3. Anchored, rated safety coverRather than an ordinary winter cover.
  4. AlarmA backup only, never a replacement for a fence.
  5. SupervisionArm's-length supervision of children under five.

About 10% of Ontario fatal drownings happen in backyard pools; backyard pools are the most common drowning location for children under five. (Lifesaving Society Ontario, 2026)

17 a year average private-pool deaths in Ontario, 2012–2016. (Lifesaving Society, 2019)

74% of pools in those deaths (where data existed) lacked a self-closing, self-latching gate; 39% had no fence or a non-compliant one. (Lifesaving Society, 2019)

Up to 90% of child drownings in home pools can be prevented by four-sided fencing. (Parachute, 2026)

Combining a fence, alarms, covers and supervision protects better than relying on any one layer alone.

Year to year

What a pool costs to run

ItemTypical market figureSource
Seasonal running cost, fibreglassUp to $1,800 ($325 chemicals)MoneySense, Jun 2024
Seasonal running cost, vinyl linerUp to $2,000 ($475 chemicals)MoneySense, Jun 2024
Seasonal running cost, concreteUp to $2,500 ($695 chemicals)MoneySense, Jun 2024
Opening + closing$500–$2,000 a yearBoulder Design, Feb 2026
Chemicals$500–$1,000 a yearBoulder Design, Feb 2026
Hydro + gas for pumps and heaters$1,200–$2,800 a yearBoulder Design, Feb 2026
Full spring opening, Halton$349Earthworks Landscaping, Sep 2026
Full spring opening, Oakville$395 before HSTTotal Tech Pools, Aug 2026
Chlorine vs salt, per year$600–$960 vs $240–$480; salt cell $400–$700 every 3–7 yearsOrange Pools, Jul 2026

Water to fill

A 75 m³ fill at 2026 rates: about $251 in Halton ($3.3441/m³) and about $377 in Hamilton ($2.42 water + $2.61 wastewater per m³, upper block). Illustrative estimate, not a quote. Assumes a 75 m³ pool filled from the municipal supply.

Insurance

  • Tell your insurer before building; brokers suggest $2M+ liability (BrokerLink, Jun 2026).
  • Inground pools usually fall under "other structures", typically 10% of the dwelling limit (BrokerLink, Jun 2026).
  • Freeze damage from improper winter closing is generally excluded (BrokerLink, Jun 2026).
  • Premiums rise about $30–$75 a month; diving boards and slides raise premiums most (Ratehub, Jun 2026).

Typical market ranges from the named source and date. Your exact price comes from an on-site quote.

Straight answers

Pool installation FAQ

How much does an inground pool cost in Hamilton and Ontario?

HomeStars' Ontario guide (Aug 2026) puts installed pools at $55,000–$110,000 for vinyl liner, $65,000–$120,000 for fibreglass and $100,000–$250,000 for concrete. MoneySense (Jun 2024) and Hamilton's Devine Image (Apr 2026) report similar ranges. These are typical market ranges, not our prices. Your exact price comes from an on-site quote.

What does a pool really cost all-in?

Devine Image (Apr 2026) says fencing, decking and landscaping push the full project 40–60% above the pool price. Common extras include an interlock pool deck at $25–$45 per sq ft (Allen Landscaping, Mar 2026), a pool fence at $4,000–$12,000 (Devine Image, Apr 2026) and a heat pump at $2,000–$6,000 (HomeStars, Aug 2026). Use the budget builder above for a line-by-line range.

Which pool type is best for Ontario: fibreglass, vinyl liner or concrete?

All three work in Ontario when built and closed properly. Fibreglass has the shortest build and a smooth surface but must never be fully drained. Vinyl liner costs least upfront, with a liner replaced every 7–10 years (HomeStars, Aug 2026). Concrete is fully custom but takes longest and needs replastering every 10–12 years (MoneySense, Jun 2024).

How long does it take to install an inground pool?

A typical project runs 8–12 weeks from design to finish, according to Ontario builders Edgewater Pools and Oakville's Finest Pools. Fibreglass site work takes about a week, vinyl liner pools a few weeks (MoneySense), and concrete pools 2–3 months before permits and inspections (Orange Pools, Jul 2026). Permits add time before digging starts.

When should I book a pool installation?

Book in the fall. Orange Pools (Jul 2026) calls fall booking the best value for securing an early-spring slot. A typical sequence is signing in September to November, design and permits over the winter, digging in March or April once frost is out, and swimming by late May to June for fibreglass or vinyl. Concrete is usually July or later.

Do I need a permit for a pool in Hamilton, Burlington or Oakville?

Yes. Hamilton requires an Enclosure Permit from the Building Division under By-law 16-184. Burlington uses an online Combined Residential Swimming Pool Application under By-law 74-2005, reviewed in 4–6 weeks. Oakville requires a Development Engineering Permit with a 5-day pre-screen then 6–8 weeks. Confirm current rules with your municipality before building.

How tall does a pool fence need to be?

Hamilton requires at least 1.5 m (By-law 16-184). Burlington requires 1.2 m for wood or 38 mm chain link, 1.5 m for wrought iron and 1.8 m for 50 mm chain link (By-law 74-2005). Oakville requires 1.20 m (By-law 2006-071). A 1.2 m wood fence that passes in Burlington fails in Hamilton. Confirm current rules with your municipality before building.

Can I fill my pool before the fence is inspected?

No. In Hamilton, Burlington and Oakville the permanent enclosure must pass inspection before the pool is filled. A fibreglass shell takes on water as gravel backfill goes in to balance pressure, so the site stays behind your city's temporary fencing while that happens; ask your city how it treats water added during installation. Oakville also bans removing any part of the enclosure while the pool holds water, and Hamilton allows temporary diamond-mesh fencing (openings ≤38 mm) for up to 7 consecutive days unless the Director allows longer.

What does a pool cost to run each year?

MoneySense (Jun 2024) estimates seasonal running costs of up to $1,800 for fibreglass, $2,000 for vinyl liner and $2,500 for concrete. Boulder Design (Feb 2026) lists opening and closing at $500–$2,000 a year, chemicals at $500–$1,000 and hydro and gas for pumps and heaters at $1,200–$2,800. A cover can save 50–70% of heating (US DOE).

Does a pool affect my home insurance?

Yes. BrokerLink (Jun 2026) says to tell your insurer before building, suggests $2M or more in liability, and notes inground pools usually fall under other structures, typically 10% of the dwelling limit. Freeze damage from improper winter closing is generally excluded. Ratehub (Jun 2026) reports premiums rising about $30–$75 a month.

What happens if you hit rock while digging?

Parts of Ancaster and the Hamilton Mountain sit on Niagara Escarpment bedrock that can need hydraulic rock breakers. Devine Image (Apr 2026) puts rock excavation at an extra $5,000–$20,000. Depth to rock varies lot by lot, so a test pit is the honest answer before you commit to a pool type and depth.

Do you also build the decking, fencing and landscaping?

Yes. Antoine installs fibreglass, vinyl liner and concrete pools and builds the landscape around them, as one project with one point of contact. That includes interlock pool decks and coping, pool enclosure fences, retaining walls for sloped lots and planting, all planned on the same drawing as the pool.

Who does the electrical and gas work?

Electrical work is done by a Licensed Electrical Contractor with a notification filed with the Electrical Safety Authority, and gas heaters are connected by a TSSA-certified gas technician, as Ontario law requires. Since Oct 1, 2025, OESC Rule 68-058 sets bonding requirements, so the deck and fence are scheduled around the electrician's bonding inspection.

Start with the yard

Plan the pool and the landscape together.

Tell us your city, the pool type you're considering and your side-yard access. We'll arrange a free on-site consultation.

Your exact price comes from an on-site quote.