Hit the closing and seasonal deadlines
Lot releases and planting windows shape the schedule.
Planting & finishing
Design & Build
One plan for the whole yard, from the first layout to the finished build.
Go to Design & BuildPool Installation
Fibreglass, vinyl liner and concrete pools, with the patio, fence and landscaping around them.
Pool Installation overviewFire Features
Gas fire pits, wood fire pits and outdoor fireplaces, planned around your city's burn rules.
Fire Features overviewWater Features
Ponds, pondless waterfalls and fountains, with the depth, power and winter care planned first.
Water Features overviewRetaining Walls
Armour stone, interlocking block and natural stone walls, built to hold the grade.
Retaining Walls overviewPrepare the site

We work with builders and developers on subdivisions, townhouse blocks and mid-rise sites. We start with tree protection fencing. We finish with final grading, sod, entry features and amenity landscaping — timed around closings and approvals.
Prequalification documents available on requestLot releases and planting windows shape the schedule.
Install to approved landscape and grading plans.
Phase site protection, grading and landscape work.
For builders and developers. Choose your city to see who handles street trees. Takes 1 minute.
Approvals & conditions — subdivision/site plan agreement, landscape and grading plans
Protect — tree protection fencing; erosion & sediment controls per the approved plan
Servicing & building — walls and grading packages as scheduled
Model homes & entry features
Final grading & sod — to the engineer-sealed plan; Tarion seasonal items allow 270 days of seasonable weather (May 1 – Nov 15)
Street trees — In Hamilton, the City's Forestry Section plants street trees in the road allowance once final grade is reached. The developer pays for them. We get boulevards ready.
Securities & close-out — approved plan, deficiencies, release
The steps follow the approved plan and the selected city’s street-tree responsibility. Confirm the agreement with the municipality.
Next: send your phasing plan with the drawings.
Hamilton requires grading plans for draft plans of subdivision and site plans sealed by a licensed P.Eng.
For new homes, final grading and sod are seasonal items with 270 days of seasonable weather (May 1–Nov 15) to complete.
Follow the approved erosion and sediment control (ESC) plan. The 2019 Erosion and Sediment Control Guide for Urban Construction is the regional reference.
Hamilton guidance calls for 1-for-1 compensation when development removes private trees at least 10 cm Trunk diameter measured about 1.37 m above the ground.. A payment made instead of doing the work, such as planting a tree. may apply when replacement on site is not possible.
Short summaries for planning. Check them against the current rules, your municipality’s conditions and your design professional.
Send your landscape and grading drawings, lot release schedule and phasing plan — we price per phase or per lot type.

Yes, to the engineer’s grading plan. Tarion treats them as seasonal items with 270 days of seasonable weather (May 1 to Nov 15), so we schedule around that.
No. In Hamilton, the City's Forestry Section plants street trees in the City-owned land along a street, including boulevards. once final grade is reached. The developer pays for them. In Oakville, north of Dundas Street, developers plant and maintain street trees until the Town assumes the subdivision — we can carry out the planting for builders.
Yes. Our grading and landscape work follows the approved ESC plan. Installing and maintaining ESC measures is by others unless confirmed in our scope.
Yes — the walls, planting and landscape around community entry features. Signage fabrication and lighting electrical are by others.
Send drawings, site details and a tender reference if you have one.