Done before September
Major work is planned for July and August.
Planting & finishing
Design & Build
One plan for the whole yard, from the first layout to the finished build.
Go to Design & BuildPool Installation
Fibreglass, vinyl liner and concrete pools, with the patio, fence and landscaping around them.
Pool Installation overviewFire Features
Gas fire pits, wood fire pits and outdoor fireplaces, planned around your city's burn rules.
Fire Features overviewWater Features
Ponds, pondless waterfalls and fountains, with the depth, power and winter care planned first.
Water Features overviewRetaining Walls
Armour stone, interlocking block and natural stone walls, built to hold the grade.
Retaining Walls overviewPrepare the site

We build walkways, play-area surrounds, walls, fences, drainage and shade trees for elementary and secondary schools. We schedule work around the school year and put student safety first.
Prequalification documents available on requestMajor work is planned for July and August.
Separate work zones and coordinate through the school.
Follow board drawings and accessible-route details.
For boards, facilities teams and GCs. Pick a month to see what work fits. Takes 30 seconds.
July–August: major work planned while schools are empty.
July and August are the main planned window. Other months depend on the board’s approval and site access.
Next: confirm the schedule with the board.
Place wide-canopy deciduous trees south and southwest of play areas for summer shade. Toronto Cancer Prevention Coalition Shade Guidelines ↗
School boards must collect police record checks from service providers who work at schools (O. Reg. 521/01, as amended by O. Reg. 298/25). In the years between checks, providers sign an offence declaration. Halton DSB, for example, applied the updated rules from April 1, 2026.
New or redeveloped outdoor paths for covered owners need set widths, slopes, surfaces, gaps and headroom.
These rules cover new or redeveloped outdoor paths. They apply to public-sector organizations, and to businesses and non-profits with 50 or more employees. Covered paths need at least 1,500 mm of clear width (1,200 mm at a curb-ramp turning space).
Children’s playground equipment and surfacing are covered by Canadian Standards Association: a group that publishes standards. Z614 and provided by the play supplier.
Wide-canopy deciduous trees south and southwest of play areas can provide summer shade.
Short summaries for planning. Check them against the current rules, your municipality’s conditions and your design professional.
At HWDSB, schools can’t hire contractors directly — work goes through Facilities Management. Other boards run their own procurement. General contractors on capital projects can send the landscape package.

Mostly in July and August, when boards schedule major renewal work. Smaller or zoned work may happen during the school year when the board allows it.
We complete the board’s police record check and attestation requirements for service providers before working on a school site.
School projects normally go through the board’s facilities department and procurement process. Send us the opportunity or invite us to quote, or have the general contractor send us the landscape package.
No. We build site work around play areas. Equipment and protective surfacing are by the play supplier, governed by CSA Z614.
Send drawings, site details and a tender reference if you have one.